What's at risk?
The average 800,000 square foot building has $24 million of replaceable physical plant touched by treated water. That translates into $1.9 million for every lost year of equipment life at 8% cost of money.
A large data center can lose a million dollars a minute if they lose cooling.
A large university may have 25 miles of condensate lines.
A production plant can lose millions of dollars a day if they shut down.